CITY OF ALBUQUERQUE, 50 MILE LOOP CHANNEL BRIDGE CONSTRUCTION

Contract Type - Subcontract

Armour Pavement, Prime Contractor

COA Contact David Harrison, Project Manager, (505)934-3669

Contract Amount: $211,425.00

Contract Date: March 21, 2015

Completed: September, 2015

Project Scope:

Bridge Construction over Embudo Arroyo Channel

Major Contract Items:

  • 110' Single Span Bridge

  • 150 sy Concrete Bridge Deck

  • Substructure

VCG was able to offer project value engineering proposal to redesign abutments, saving the COA cost of Auger Cast Piling, and time savings. Auger Cast Piling was removed and replaced using a spread footer.