CITY OF ALBUQUERQUE, 50 MILE LOOP CHANNEL BRIDGE CONSTRUCTION
Contract Type - Subcontract
Armour Pavement, Prime Contractor
COA Contact David Harrison, Project Manager, (505)934-3669
Contract Amount: $211,425.00
Contract Date: March 21, 2015
Completed: September, 2015
Project Scope:
Bridge Construction over Embudo Arroyo Channel
Major Contract Items:
-
110' Single Span Bridge
-
150 sy Concrete Bridge Deck
-
Substructure
VCG was able to offer project value engineering proposal to redesign abutments, saving the COA cost of Auger Cast Piling, and time savings. Auger Cast Piling was removed and replaced using a spread footer.